RU EN
Technology About Us Objects Catalog Construction Prices Contacts

TURNKEY POOL
FROM CONCRETE PANELS

We design and build premium swimming pools from ready-made concrete panels. Quick installation, perfect geometry and European quality of materials.

15 days
Construction period
from 60,000 AED
Turnkey cost
Factory quality
Concrete panels M400
European builders
Experienced team
Villa construction Renovation

Calculate project cost

Leave a request and our engineer will contact you for a free consultation.

By clicking the button, you agree to privacy policy.

Why choose concrete panels?

An innovative approach to the construction of private swimming pools

Modern house with swimming pool

Ideal geometry

No manual filling errors

Installation in 15 days

3 times faster than monolith

Monolithic strength

Pre-mixed concrete M400

100% tight

No cold seams

Savings on finishing

Perfectly smooth wall surface

Reinforced concrete panels

Reinforced concrete panels

01

Manufactured in factories under strict quality control. Ideal geometry, smooth surface and concrete grade M400 guarantee the durability of your pool for over 50 years without cracks. On-site pool installation in just 1 work shift. Panels are connected by welding and sealed with concrete mixture.

Pool finishing – Porcelain tiles

Pool finishing – Porcelain tiles

02

We use large-format porcelain tiles to finish our premium pools. A highly durable and hard material that imitates natural stone. The perfect solution for the pool area — non-slip, UV-resistant, and retains its premium appearance for years. Minimal seams. Maximum watertightness and durability.

Smart systems

Smart systems

03

Full automation of water cleaning, heating and filtration. Innovative control systems maintain crystal clear water 24/7 with minimal use of harsh chemicals. The equipment can be installed in a basement pit or in a separate outdoor utility room.

TechHouse is a company with 15 years of experience in the construction and renovation of villas in Moscow and Dubai.

Our new direction is premium prefabricated concrete pools. We can install a concrete pool in 1 work shift, in a place inaccessible to traditional monolithic pools.

Artyom Popov, Studio Head
"We are building an assembly line for pool production. The IKEA of swimming pools. The product must be easy to install, durable in quality, and affordable thanks to reduced manual labor."
Maksim Kovalenko CEO TechHouse.ae
0
Years of work experience
0+
Built villas
0+
Implemented renovations
0+
Built pools

Realized objects

POOL IN DUBAI HILLS 2025
POOL TYPE CONCRETE PANELS
SIZE 7 × 3 M
DEPTH 1.2 M
FINISH PORCELAIN TILES
CONSTRUCTION DURATION 15 DAYS
PRICE WITH ALL COSTS 110 000 AED
SAVINGS FROM MONOLITH 40 000 AED
Pool
Pool
Pool
POOL IN SPRINGS-10 2025
POOL TYPE CONCRETE PANELS
SIZE 6 × 3 M
DEPTH 1.4 M
FINISH PORCELAIN TILES
CONSTRUCTION DURATION 15 DAYS
PRICE WITH ALL COSTS 100 000 AED
SAVINGS FROM MONOLITH 40 000 AED
Pool
Pool
Pool
Pool
Pool
Pool
Pool
POOL IN DUBAI HILLS 2025
POOL TYPE CONCRETE PANELS
SIZE 9 × 3 M
DEPTH 1.5 M
FINISH PORCELAIN TILES
CONSTRUCTION DURATION 25 DAYS
PRICE WITH ALL COSTS 150 000 AED
SAVINGS FROM MONOLITH 60 000 AED
Pool
Pool
Pool
Pool
Pool
Pool
Pool
Pool
Pool
POOL IN SPRINGS-15 2025
POOL TYPE CONCRETE PANELS
SIZE 6 × 3 M
DEPTH 1.4 M
FINISH PORCELAIN TILES
CONSTRUCTION DURATION 15 DAYS
PRICE WITH ALL COSTS 110 000 AED
SAVINGS FROM MONOLITH 40 000 AED
Pool
Pool
Pool
Pool
Pool
POOL IN EMIRATES HILLS 2025
POOL TYPE CONCRETE PANELS
SIZE 7 × 3 M
DEPTH 1.4 M
FINISH PORCELAIN TILES
CONSTRUCTION DURATION 20 DAYS
PRICE WITH ALL COSTS 130 000 AED
SAVINGS FROM MONOLITH 50 000 AED
Pool
Pool
Pool
Pool
Pool
POOL IN DUBAI HILLS 2025
POOL TYPE CONCRETE PANELS
SIZE 8 × 3 M
DEPTH 1.4 M
FINISH PORCELAIN TILES
CONSTRUCTION DURATION 25 DAYS
PRICE WITH ALL COSTS 150 000 AED
SAVINGS FROM MONOLITH 60 000 AED
Pool
Pool
Pool
Pool
Pool
POOL IN DOMODEDOVO, MOSCOW 2022
POOL TYPE CONCRETE PANELS
SIZE 8 × 3 M
DEPTH 1.3 M
FINISH PORCELAIN TILES
CONSTRUCTION DURATION 20 DAYS
PRICE WITH ALL COSTS 110 000 AED
SAVINGS FROM MONOLITH 50 000 AED
Pool
Pool
Pool
POOL IN SOCHI 2022
POOL TYPE CONCRETE PANELS
SIZE 9 × 3 M
DEPTH 1.5 M
FINISH PORCELAIN TILES
CONSTRUCTION DURATION 30 DAYS
PRICE WITH ALL COSTS 150 000 AED
SAVINGS FROM MONOLITH 60 000 AED
Pool
Pool
Pool

Finished projects

Basic pool configurations with transparent prices
Child 1
Children's 2
Children's 3
Children's 4
Children's 5

Children's

4 × 3 m Depth 1 m 12 m³ Implementation period - 15 days

A shallow pool perfectly sized for children. Fast heating, safe coating and comfortable handrails. Includes pump, filtration system, and LED lighting. Optional water heating and cooling system available.

Compact 1
Compact 2
Compact 3
Compact 4
Compact 5

Compact

5 × 3 m Depth 1.5 m 22 m³ Implementation period - 15 days

Compact pool for small plots or townhouses. A complete set of necessary equipment. Large-format light-colored porcelain tiles, natural stone structure. Stainless steel staircase.

Classic 1
Classic 2
Classic 3
Classic 4
Classic 5

Classic

6 × 3 m Depth 1.5 m 27 m³ Implementation period - 15 days

Standard rectangular swimming pool for a country house. Skimmer type. Ideal size to ratio prices. It is possible to install concrete steps and concrete shelves inside the pool. Includes pump, system filtration, LED backlight. Additionally, it is possible to install a water heating and cooling system.

Sports 1
Sports 2
Sports 3
Sports 4
Sports 5

Sports

8 × 3 m Depth 1.5 m 36 m³ Implementation period - 20 days

Full size pool for mid lot. Concrete steps and concrete shelf inside the pool. Full set of equipment. Large-format mosaic-type porcelain tiles.

Premium 1
Premium 2
Premium 3
Premium 4
Premium 5

Premium

9 × 4 m Depth 1.5 m 54 m³ Implementation period - 30 days

Exclusive design project with overflow system, hydromassage and underwater lighting. Ideal for large properties. Complete equipment package. Concrete steps inside the pool. Porcelain tiles in white marble finish.

Family 1
Family 2
Family 3
Family 4
Family 5

Family

10 × 5 m Depth 1.5 m 75 m³ Implementation period - 30 days

Spacious swimming pool with variable depth and built-in jacuzzi area. Safe shallow area for comfortable bathing for children. Large format gray porcelain tiles. Concrete steps and concrete shelf inside the pool. Includes pump, filtration system, LED lighting.

Our prices are very affordable and 30-50% lower than for the construction of traditional monolithic concrete swimming pools.

OPEN CATALOG

We work closely with our clients to create unique, high-quality swimming pools that combine style and reliability.

Choose one of the standard configurations above, or contact us to get a custom quote for your pool at the best price on the market.

Pool construction technologies

Construction process your pool -
from idea to first swim

Engineering and design
3D model, calculation of loads and networks
+
Engineering and design

At the first stage, we develop a detailed architectural design and a 3D model of the future pool. Engineers calculate the load on the bowl and design the hydraulic and electrical systems. You receive a complete set of working documentation for flawless construction and an accurate estimate. In parallel, we coordinate and obtain permits from the management company and Dubai Municipality.

Installation of a concrete bowl
Excavation work, installation of a concrete pool bowl
+
Casting a concrete bowl

We dig a pit, install a drainage system and compact the soil. We carry out installation ready-made concrete bowl, which is delivered to the site and installed by truck crane within 1 day. We weld the panels together and seal the seams.

Waterproofing
Ideal geometry and leakage protection
+
Plastering and waterproofing

We apply penetrating and coating waterproofing in several layers, followed by mandatory hydrotesting (filling the pool with water for 3 days).

Equipment installation
Installation of filtration, heating and automation
+
Equipment installation

We install embedded parts, pumps, filter units, disinfection and heating systems. We connect smart automation that independently monitors water quality and saves energy. We complete the piping to the skimmer and nozzles, then backfill around the bowl with soil.

Finishing and commissioning
Laying porcelain tiles and first start of water
+
Finishing and commissioning

The final aesthetic stage: lining the bowl with glass mosaic, porcelain stoneware, or PVC film using epoxy grout. We fill the pool with water, calibrate the chemical dosing stations, configure all settings, and hand over the finished pool to you.

Lilia Orujeva
Yana Knahi
Procurement Manager

Answer a few questions
and receive a preliminary estimate
cost of your project